Three prices, one job

Why three quotes for the same work come back thousands apart

Almost never because one firm is greedy. Nearly always because the three of them are quoting for three different pieces of work, and the document does not say so.

Before you compare anything

A total is not a specification

The single most useful thing you can do with three quotations is ignore the totals for an hour. Put them side by side and find, on each one: the size specified and where that number came from; what is included beyond the equipment; what is explicitly excluded; what happens on handover; and what the warranty actually covers and who honours it.

Most of the difference between three prices lives in those five lines. When a quotation does not answer them, the gap is not a discount — it is work that has not been priced yet, and it will arrive later as a change order at a moment when you have no leverage at all.

And one uncomfortable point. We are one of the firms you might be comparing, and everything on this page can be used against us exactly as easily as against anybody else. That is the intention.

Work it through

What differs between them, and how you got them

Nothing is sent anywhere and nothing is recorded. This is what we would ask you on the telephone.

An enquiry that came through a lead service has already cost somebody money before anybody looked at your house

The way most of those sites work is that your enquiry is sold. Several contractors pay for the same enquiry, sometimes within minutes of you submitting it. That cost is real, it is per enquiry rather than per job, and it is paid whether or not anybody wins the work — which means the firms that use those services have to recover it from the jobs they do win.

What that changes about the visit. A contractor who has paid for your details and knows two others have as well is under pressure to close on the day. That is where same-day discounts, prices that expire at the end of the visit and long sales presentations come from. None of it is dishonest and all of it is a symptom of the route rather than of the firm.

What to do about it, which is simple: ask whoever attends whether they paid for your enquiry. It is a fair question and a straight firm will answer it. Then say plainly that you will not sign on the day, whatever the price does. A quotation that is genuinely good is still good on Thursday.

And ours, since you are entitled to ask: if you reached us through a service that sold our name to you, ask us the same question and hold us to the same answer. The page is no use to you if it only points at other people.

What we would do

Line the three up on five rows, and the gap usually explains itself

Take a sheet of paper and give it five rows: the size specified; what is included besides the equipment; what is excluded in writing; what happens at handover; and the warranty, with who honours each part of it. Fill in all three columns. In our experience the largest single gap is almost always row two or row three.

The five things most often in one quotation and not the others: duct remedial work; a new thermostat and controls; a condensate pump or a new drain route; electrical — a disconnect, a whip, sometimes a breaker; and permit and inspection where the work requires it. Any one of those is a meaningful sum, and the cheaper quotation frequently does not exclude them in writing either, which is worse than excluding them.

Then ask each firm the same single question: “what is in the other two quotations that is not in yours?” A firm that knows its market can usually tell you, and how they answer tells you more than the number does.

About a gap you cannot explain

Ask each firm what is in the other quotations that is not in theirs. It is a simple question, it is not rude, and the quality of the answer is itself information.

When a neighbour recommended them

The most useful source there is, with one caveat: ask what job they actually did. A firm that replaced your neighbour’s furnace well is evidence about furnaces, not necessarily about ductwork, ductless or a commercial rooftop. Ask specifically, and ask whether anything went wrong and how it was handled — that answer is worth more than the original recommendation.

In every case

Five rows to put every quotation on

  • The size, and where the number came from

    With the calculation inputs. Not the tonnage already installed and not the floor area.

  • What is included besides the equipment

    Ductwork, controls, condensate, electrical, permit and inspection. Each one either in or explicitly out, in writing.

  • What happens at handover

    Whether airflow, static pressure, charge against target and temperature split are measured and written down on the day.

  • The warranty, split into parts and labour

    How long each lasts, what registration is required, who honours it, and what voids it. These are frequently three different answers.

  • Who is actually doing the work

    The firm on the quotation, a subcontractor, or a crew hired for the week. Ask, and ask who you call in year two.